This time, the experts analysed thoroughly conveyor system transporting the goods to different parts of the warehouse and transporting goods after being picked from the shelves to the sorter and to shipping area. 

 
Tests in ILS in Zakroczym have now lasted for several months. At first, each and every element of the system was tested, later their integration processes.  It is very important that warehouse management system (WMS) and equipment management system (WCS) cooperate and communicate with each other in a planned and correct way.
 
During the last phase of testing, the full warehouse transportation path for goods with different loads (from 5 kg to 35 kg) was tested. The system efficiency was also tested with large number of totes and containers on the warehouse conveyors.  Recurrence of the system results was also a subject to tests. 
 
The tests shall be continued for different ECLiR work scenarios, prepared on the basis of everyday distribution work. 
 
Next tests are planned to be performed in September 2014. 
 
źródło: e-autonaprawa.pl
10.08.2016
back